Question #1

Consider the following potential investment, which has the same risk as the firm's other projects:

Time

Cash Flow

0

-$95,000

1

$20,000

2

$24,000

3

$24,000

4

$24,000

5

$24,000

6

$32,000

a) What are the investment's payback period, IRR, and NPV, assuming the firm's WACC is 8%.

b) If the firm requires a payback period of less than 5 years, should this project be accepted?Be sure to justify your choice.

c) Based on the IRR and NPV rules, should this project be accepted?Be sure to justify your choice.

d) Which of the decision rules (payback, NPV, or IRR) do you think is the best rule for a firm to use when evaluating projects?Be sure to justify your choice.

Question #2

A firm believes it can generate an additional $250,000 per year in revenues for the next 5 years if it replaces existing equipment that is no longer usable with new equipment that costs $240,000. The firm expects to be able to sell the new equipment when it is finished using it (after 5 years) for $10,000. The existing equipment has a book value of $20,000 and a market value of $12,000. Variable costs are expected to total 70% of revenue. The additional sales will require an initial investment in net working capital of $15,000, which is expected to be recovered at the end of the project (after 5 years). Assume the firm uses straight line depreciation, its marginal tax rate is 30%, and its weighted-average cost of capital is 10%.

a) How much value will this new equipment create for the firm?

b) At what discount rate will this project break even?

c) Should the firm purchase the new equipment?Be sure to justify your recommendation.

Question #3

Your company is interested in having a new facility constructed. The contractor expects that it will take approximately 3 years to complete the building. The contractor has offered you three payment plans for the building. They are as follows:

Time

Plan 1

Plan 2

Plan 3

今天

$100,000

$820,000

$500,000

1 year from now

$1,100,000

$820,000

$0

2 years from now

$1,100,000

$820,000

$1,400,000

3 years from now

$1,100,000

$820,000

$1,400,000

The CFO of your company has asked you to provide recommendation concerning which payment plan to accept. What is your recommendation? Assume your weighted-average cost of capital is 10%.

Question #4

List and describefour "red flags" that may indicate you should consider revising your overhead allocation system.

Question #5

)描述unit-related之间的差异,batch-related, and product-sustaining activities. Give one example of each type of activity.

b) Describe the difference between transaction drivers and duration drivers. When would one type be preferred over the other?

Reference no: EM13487095

Previous Q& A

Explain what is the ph at the equivalence point

A 25ml sample of 0.200 M HCO2H(aq) is titrated with 0.100 M KOH (aq). What is the pH at the equivalence point. (Ka of HCO2H = 1.8 x 10^-4)

确定三个耦合汽车的速度

A railroad car of mass 3.3 104 kg moving at 4.50 m/s collides and couples with two coupled railroad cars, What is the speed of the three coupled cars after the collision

Description of what is an internal control

Do not simply copy concepts directly from text. Read other sources about internal control from other texts, the web, articles from the library or elsewhere and provide examples to help explain your arguments. Make sure you reference material using..

Find how long will the mortar shell remain in the air

A mortar crew is positioned near the top of a steep hill. Enemy forces are charging up the hill and it is necessary for the crew to spring into action. How long will the mortar shell remain in the air

What is hoorus temperature

The robot HooRU is lost in space, floating around aimlessly, and radiates heat into the depths of the cosmos at the rate of 11.3 W. What is HooRU\'s temperature

Find the area of the parallelogram

The displacement vectors 38.5 cm at 15.0° and 23.0 cm at 62.0° both start from the origin and form two sides of a parallelogram. Find the area of the parallelogram

What is the pressure amplitude

The pressure in a traveling sound wave is given by: ?p = (1.6 Pa) sin ?[(1.30 m-1)x - (375 s-1)t]. What is the pressure amplitude

The aqueous ammonium chloride and aqueous lead(ii) nitrate

Aqueous ammonium chloride and aqueous lead(II) nitrate Express your answer as a chemical equation. Identify all of the phases in your answer. Enter NOREACTION if no reaction occurs.

Express comprehensive master budget

预计12月20 x0销售300000美元。Credit sales typically are 70 percent of total sales. Intercoastal's credit experience indicates that 20 percent of the credit sales are collected during the month of sale, and the remainder are co..

Explain how to use the solvent to dissolve the tlc plate

Is it necessary to use the same solvent to dissolve the sample as is used to develop the tlc plate(TLC). Why

Reviews

写评论

Similar Q& A

Preston concrete is a major supplier of concrete to

preston concrete is a major supplier of concrete to residential and commercial builders in the pacific northwest.nbsp

Determing cost driver-computing cost

What is the appropriate cost driver for allocating overhead to pizzas in Year 1? Using normal costing, compute the cost of each of the 336,033 meat pizzas produced in year 1. Was overhead over-or under applied during the year? By how much? Why do yo..

Cash conversion cycles-sears and jc penney

Refer to the Financial Statements for Sears (SHLD) and JC Penney's(JCP) on finance.google.com Calculate each company's Cash Conversion Cycle for the two most recent years.

Job costing-process costing-operations costing

How do job costing, operations costing and process costing differ? Give two typical examples of products or organizations for each system.

In working out your responses to the discussion question

in working out your responses to the discussion question you should choose examples from your own experience or find

Question 1a list and describe four potential problems with

question 1a list and describe four potential problems with a traditional overhead allocation system.b list and

Development of cost standards

How are cost standards developed? Discuss the purpose for cost standards

What is the expected value of perfect information

Tversky and Kahneman describe three types of heuristics that people use in judgments under uncertainty. What do they mean by the term heuristics? Briefly describe the ones that they mention

Determining cost of asset

东北伐木公司$ 120,000。卖方同意允许5%的折扣,因为东北付了现金。确定在购买锯的资产帐户中要限制的金额。

总共分配多少成本

How much cost, in total, would be allocated in the first-stage allocation to the Assembly activity cost pool?

Cvp analysis-breakeven analysis

Jetset Marchinations,Inc。预计将在其燃油高速飞机S2S-900的制造和销售方面非常成功。这架飞机的售价约为每飞机7000万美元。

Cost of goods manufactured-cost of goods sold

During the year, the company purchased $100,000 of raw material and spent $340,000 on direct labor. Other data: Manufacturing overhead incurred $450,000; sales, $1,560,000; selling and administrative expenses, $90,000; income tax rate, 30%.