1) ToxicsRUs (Toxics) entered into a contract with Mooncor to clean up a decommissioned bitumen refinery near Fort McMurray, Alberta. Toxics intends to recycle scrap metal and clean up the site over an projected 364 day period. If the recycling, clean up, and de-toxifying activities are judged acceptable by the government, Mooncor will sell the land to Toxics for $500,000. Mooncor originally purchased the land for $1.5 million (M). If the site is successfully cleaned up, it has an estimated resale value of $5.5M. Trucking costs to haul away the scrap metal is estimated at $1.20 per tonne per loaded kilometer. The scrap yard is 100 kms. from the industrial site. Each truck can carry 10 tonnes of scrap.

100 full-time workers will be needed for the project. They will be paid an average hourly wage of $40 plus benefits totaling 25% of the hourly wage. The standard work period is seven days on followed by seven days off. There will be two shifts of workers. One shift will work from 6 AM to 6 PM; the other will work from 6 PM to 6 AM. Food and accommodation for each on-duty worker will cost $1,000 per week. Costs to lease a bus to transport the workers from camp to the industrial site will be $400 per round trip. Two round bus trips are needed to transport the workers each day. Equipment will be leased for $2M over the life of the project, including maintenance and repairs. Fuel and other supplies are estimated at $400,000 in total. Temporary leased buildings used at the site will cost $200,000 in total.

An estimated one million cubic metres of contaminated soil will need to be processed at a cost of $10 per cubic metre. These costs exclude those listed above.

Required:

a. Calculate the project's estimated revenues and costs. Assume the land will be transferred to Toxics at the end of the project for $500,000 and immediately resold at the estimated fair market value. Ignore revenues and expenses related to the sale of scrap metal.

b。多少吨的废金属需要recovered for Toxics to earn a profit of $1.25M, if scrap can be sold for $220 per tonne?

c. Ignore your answer to part b. Assume that 400,000 tonnes of scrap metal will be recycled. What is the lowest price per tonne of scrap metal that Toxics can receive for the project to break even?

2. Dudley Industries developed the following standard costs for direct materials and direct labor to produce gadgets:
标准数量Standard price

标准数量

Standard price

Direct materials

0.60 pounds

$25 per pound

Direct labor

0.20 hours

18美元每小时

During October, Dudley produced and sold 8,000 gadgets using 5,000 pounds of direct materials at an average cost per pound of $22.50, and 1,560 direct labor hours at an average wage of $18.20 per hour.

Required: What is the direct material quantity variance for October and what is a plausible cause of this variance?

Verified Expert

This is a verified solution. The solution is in MS Excel document and all the questions have been appropriately answered along with the necessary calculations.

Reference no: EM13901436

Prepare cash flow forecast and supporting schedules

Prepare a cash flow forecast and appropriate supporting schedules for the month of July and Fixed administrative expenses include $2,000 per month of depreciation expense.

Describe steps that marian should take to resolve situation

Assuming Marian Nevins believes the controller has acted unethically and not apprised the CEO and CFO of the findings, describe the steps that she should take to resolve the

Discuss citing specific standards from the cma code

Is Gus Swanson's discussion with the team about the prospective sale of Emery unethical? Discuss, citing specific standards from the CMA Code of Professional Ethics for mana

Compute the total manufacturing overhead cost variance

How much was Topaz's operating income (income before taxes) last year and What type of responsibility center is this subunit - Compute the total manufacturing overhead cost va

Is a flexible budget always better

Flexible budgets provide different information than static budgets. Discuss some of these differences. Is a flexible budget always better? Are there times when you'd recomme

Review standard costs - wake up and smell the coffee

Review the Standard costs: wake up and smell the coffee. article. When evaluating performance, many organizations compare current results with the actual results of previous

它有什么cash flows from financing activities

1.Refer to Arctic Cat's statement of cash flows in Appendix A. What are its cash flows from financing activities for the year ended March 31, 2011? List the items and amounts.

Piaggio''s statement of cash flows in appendix a

1.Refer to Piaggio's statement of cash flows in Appendix A. What investing activities result in cash outflows for the year ended December 31, 2011? List items and amounts.

Reviews

Write a Review

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

beplay安卓下载

Baidu